User Guides
Reference guides and task materials assist in submitting transactions within Standard Market Design Applications and inputting data into our Customer & Asset Management System.
Date Document Title Document Type
May 10, 2007
Details for all users regarding the functionality and requirements of the CAMS tool. Supporting CAMS information resides on the Additional Training Materials web page.
PDF (339k)
Aug 27, 2008
This document, effective September 10, 2008, provides details regarding the functionality and requirements of the CAMS tool. Supporting CAMS information resides on the Additional Training Materials web page.
PDF (403k)
Aug 27, 2008
Provides basic FAM user information including how to get access, log-on, details of the four tabs and quick references.
PDF (710k)
Mar 20, 2006
Guide for understanding the general concepts, reference and task information related to using the eFTR application.
PDF (1.0Mb)
Dec 06, 2007
Bidders guide and reference for the Forward Capacity Auction associated with the Capacity Commitment Period beginning June 2010
PDF (1.2Mb)
Oct 01, 2005
User guide for the Generating Availability Data System (GADS) NxL portal.
PDF (1.5Mb)
May 09, 2008
User guide for understanding the requirements and submitting the Generator Asset Registration Form (ARF).
PDF (277k)
May 09, 2008
User guide for understanding the requirements and submitting the Load Asset Registration Form (ARF).
PDF (277k)
Apr 18, 2007 PDF (1.0Mb)
May 09, 2008
User guide for understanding the requirements and submitting the Settlement-Only Generator Asset Registration Form (ARF).
PDF (321k)
Dec 18, 2007
Effective 12/13/2007 this user guide explains the modifications in the report, including nomenclature consistency, station identifiers, and format of report.
PDF (73.0k)
Jan 12, 2007
Reference and Task information documentation related to Submitting Bids and Offers Using eMkt.
PDF (2.8Mb)
Jun 20, 2008
Reference and Task information documentation related to the Enhanced Energy Scheduling (EES) application.
PDF (910k)
May 04, 2007
Provides documentation on the use of the Settlements Market System (SMS) for IBTs, Meter Readings, Installed Capacity information and Forward Reserve Market requirements.
PDF (694k)
Oct 31, 2007
This user guide is a reference document created for the specific purpose of submitting Network Load within the ISO New England marketplace.
PDF (1.2Mb)


  Copyright ©2008 ISO New England Inc.